Remediation Case Studies

Hydrocarbon Spill

Pumping Wellhead Spill. The spill covered a large area with the contamination seeping 2”-3” deep into the soil. The polluted area was disked and RemediAde™ was applied at .38 gallons per cubic yard. Initial TPH contamination was 54,426, after 2 weeks the treated area had a TPH of 9,895, and after 4 weeks the TPH was reduced to 14 with no odor of hydrocarbons

Hydrocarbon and Brie Spill

Tank Battery Spill. Spill involved crude oil and brine that polluted the well site location. The contaminated site was treated with 55 gallons of RemediAde™ per acre. Following treatment with RemediAde™, the site was seeded with Bermuda grass. Results of recovery to the spill area are witnessed in only 2 months.

Brine Spill

Waste Water Disposal Site. Overflow from pit created major brine spill. Spill area was treated with RemediAde™. RemediAde™ was disked in at an application rate of .14 gallons per cubic yard. Following treatment, the contaminated area was seeded with Bermuda grass. Results of recovery to the spill area are witnessed in 7 weeks.